News

Installation of the pilot gas cleaning system and modernization of the blast furnace charging equipment 🎥👷‍♂️

On the occasion of Steelworker’s Day, we’re excited to share footage from one of our completed projects for ArcelorMittal Poland.

The video showcases scenes from the renovation of blast furnace No. 2 in Dąbrowa Górnicza, including the Impressive pilot gas cleaning installation and the modernization of the blast furnace charging equipment.

🔢 The project in numbers:

👉 Dismantled structures: 1,897 tons
👉 Installed new structures: 1,763 tons
👉 New foundations: 780 m³
👉 Insulating concrete: 670 tons
👉 Corrosion protection: 2,450 m²
👉 Wear-resistant coating: 900 m²

💡 Can’t quite imagine those numbers? To put it into perspective, the newly installed structure accounts for approximately 24% of the mass of the Eiffel Tower! We want to extend our heartfelt thanks to our dedicated team for their safe and professional execution of this project. A big thank you also to ArcelorMittal Poland for their collaboration and permission to share this material with you.

📽️ For detail enthusiasts: The tonnage of individual elements from dismantling and installation is featured in the video.